Option 1
This concept is largely based on the preferred option that emerged in the 2014 investigation. It shows all three groynes removed, reconstruction of the sloping rock seawall, a stepped concrete seawall in the popular high-use area. By removing the groynes this concept would create an uninterrupted shoreline and improve people’s connectivity along the beach in front of the structure.